Warning: mkdir(): No space left on device in /www/wwwroot/NEW17.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/cyzunion.com/cache/b3/c893a/49bb3.html): failed to open stream: No such file or directory in /www/wwwroot/NEW17.COM/func.php on line 115
HENGTONG GROUP CO.,LTD.

    麻豆一区二区三区,精品人妻无码麻豆,麻豆免费看片,亚洲AV成人无码久久精品麻豆

    Solutions

    Solutions

    Home| Solutions| Case Study| New Energy Solutions

    • Red Sea Utility Assets and  Infrastructure Project (KSA) 33kV submarine interconnection  EPC project (2021)

      Red Sea Utility Assets and Infrastructure Project (KSA) 33kV submarine interconnection EPC project (2021)

      Red Sea Utility Assets and Infrastructure Project (KSA) 33kV submarine interconnection EPC project (2021)

    • WindFloat Atlantic (Portugal) 150kV export cable system EPC  & Maintenance project (2018)

      WindFloat Atlantic (Portugal) 150kV export cable system EPC & Maintenance project (2018)

      WindFloat Atlantic (Portugal) 150kV export cable system EPC & Maintenance project (2018)

    • Kazakhstan Atyrau Refinery Crude Oil Deep Processing Project

      Kazakhstan Atyrau Refinery Crude Oil Deep Processing Project

      Kazakhstan Atyrau Refinery Crude Oil Deep Processing Project

    • 35KV submarine cables project of BOROPTIK, Turkey

      35KV submarine cables project of BOROPTIK, Turkey

      35KV submarine cables project of BOROPTIK, Turkey

    • Malaysia Petronas’s Project

      Malaysia Petronas’s Project

      Malaysia Petronas’s Project

    • Sea Trial Project

      Sea Trial Project

      Sea Trial Project

    •  The first batch of submarine power cable

      The first batch of submarine power cable

      The first batch of submarine power cable

    网站地图